Basement, part seven: As fun as watching mud dry

Sunday, May 20th, 2007 by The Gimlet

MuddingMud — mud everywhere! In order to put the tape and joint compound (commonly called “mud”) on the walls and ceiling I used the traditional tools. My hand has become one with the 6 inch and 12 inch knives. It takes three layers of mud to finish the walls. The first layer embeds the tape against the drywall. Layers two and three are done to smooth out the wall, and then you sand it smooth. This week I will begin sanding. Drying takes so long here I was wondering how a house can be built in one week on TV. Tonight they showed a butane heater running the temperature up to between 90 and 100 degrees to dry out the mud. Now I know how they do it on TV.

Because of tools and storage in the basement, I cannot do the mud over the entire basement at once. I have started in the workroom, to develop some ability to do this right, and also in one of the back bedrooms and hallway after my skill level improved. The next rooms will be the rec room and stair case. Finally will be the other back bedroom and the laundry room. I still need to hang the metal corners, but that will go quickly.

Updated fireplaceWhile I was waiting for layer two to dry, I tiled the fireplace surround. When I finished the third layer of mud I was able to grout the surround. My nifty new diamond bladed wet saw worked great to cut the marble tiles. The fireplace surround project will be finished when I install a wood trim border to cover the edges between the marble and the wall.

SandingAfter I finish sanding the two rooms I am working on I will be putting a primer/sealer on the walls and follow that, in the back bedroom and hallway with paint. I think I will do the finish electrical after the paint, but before I move tools and stuff into the rooms. I just like the idea of having two rooms completed. This may change depending on my mood at the time.

Related posts:

The reward for good work is more work
Basement, part five-ish: Is that a powdered sugar donut or drywall dust?
Basement, part six: Time for the next list

Basement, part six: Time for the next list

Tuesday, April 24th, 2007 by The Gimlet

Editor’s note: As you might guess from the title, The Gimlet completed his task list from an earlier post. There is still plenty to do, and sadly the basement won’t be finished in time to accommodate our out-of-town guests, but the end is in sight.

The drywall is done!Last night we finally got the last of the wall board up. I feel like it took quite a long time, but I had to tear out one third of the basement, put in the electrical circuit and put in the drywall. Still this has been an odyssey.

I have purchased some of the mud needed and all the tape needed to finish the drywall. After we complete that, and I tile the fireplace surround, it will be time to seal the drywall, paint the walls, finish electrical & plumbing, add the wet bar (including tiling the countertop) and do the finish carpentry. The finish carpentry will be to add crown moldings, shelves on the half-walls, stair baseboards and a railing, and baseboards in the rest of the basement. The carpet is paid for and has arrived, and the marble tile was ordered today and should arrive later this week. After all I mentioned above we will install the carpet and have a beautiful, but empty basement.

Related posts:

Plumbing, part three: It's done!
Basement, part nine: Grunge begone
Basement, part 9.5: A quick trim

Basement, part five-ish: Is that a powdered sugar donut or drywall dust?

Saturday, March 24th, 2007 by HML

Camellias, Spring 2007First, by way of a mental health break: spring is here! The camellia is finally in bloom, and the lilacs should follow. Pretty! Okay; back to work.

While we’re not as far along as we had hoped to be, we’re happy to report that most of the projects on The Gimlet’s task list are complete or well underway. The laundry and utility rooms are finishedThe family room, laundry room, hallway and staircase are fully wired, plumbed, insulated, and drywalled, plus The Gimlet built some nice shelving in the laundry room. The original homeowners left behind some sheets of water-resistant drywall, so we used that in the laundry room (hence the green wall).

The new fireplace insertThe family room’s gas fireplace insert was installed earlier this week, much to our delight. Not only is it wonderful to have one fully functional, lovely appliance in the midst of the piles of construction debris, but we’ve never owned a remote control that shoots flames before, and are unsure how we lived before possessing such a device. Speaking of flame throwers, rest assured: there will be a new look to the fireplace area and there will be a large high-definition, plasma screen television mounted above the fireplace, but the Man-Cave Monster Television Faction and the Attractive Mantle and Surround Faction are still in negotiations over details.

New wiring for the east bedroomBack to the list, we decided to drywall the workroom last so it could be used as a staging area for the rest of the remodel, but it is wired and insulated. Yesterday the east bedroom was demolished to the studs and today The Gimlet is adding framing support where needed, updating the wiring, and adding insulation. We only have about one week left before we must return our friend’s panel lift, so the race is on to install as much drywall as possible.

Once the drywall is in place, another friend, The Sheetrocking Swede, has very graciously offered his expertise to mud, tape, and in all ways cover up our mistakes and make the walls look as nice as we’d like them to be. Carpet for the family room, hallway, bedrooms and staircase is on order as well, to be installed after the rooms are painted and finished with crown molding and baseboards to match the upstairs. Our goal is to have the paint, trim and carpet in place by early May to greet our expected houseguests. We can dream, right?

PS: Check out the bar sink. Obviously meant to be.

Related posts:

Nothing good happens quickly in a reef tank
Basement, part six: Time for the next list
Basement, part eleven: Insert bar exam joke here

Nothing good happens quickly in a reef tank

Sunday, March 4th, 2007 by HML

As we move forward and begin drywalling the laundry room, it seems like a good time to mention the first small steps in the reef process. The Gimlet installed two 20-amp circuits and dedicated one switch on the Manabloc for the system. The water line will connect to a reverse osmosis/deionization unit (RO/DI); the resulting water will then be used to make saltwater and as freshwater topoff.

A 12′ x 3′ area with 8′ ceiling is available for the tank site, and as the family room is in the basement, the tank will rest on a concrete floor. The tank will share a wall with the laundry room. Originally the plan was to house the tank in the laundry room, creating a picture window effect in the family room while giving plenty of space to work and get wet, but unfortunately the wall is a weight-bearing wall and cannot be altered. With that in mind, I hope to house the sump, refugium, and other equipment in the laundry room, below and behind the display tank.

Not sure how this will all work out, which brings up the most important step in this whole process: research. This large space affords a wonderful opportunity in reefkeeping, and I want to be as successful as possible. I’ve been reading, checking out the myriad on-line resources and communities, and our previous nano experience taught us some valuable hands-on lessons. So for now, I’m deciding how large of a tank to get, pondering deep versus shallow (leaning towards shallow; I like being able to reach in and tinker around), learning about plumbing and lighting options, and of course livestock choices (which will affect the kind of light I choose).

Suggested reading:

  • Fenner, Robert M. The Conscientious Marine Aquarist. Microcosm: Vermont, 1998. The first time I entered a local saltwater-specialty store, the clerk strongly suggested I read this before doing anything else. Not only does this book provide excellent, well-written (even funny at times), easy-to-understand advice, it also seeks to instill a sense of responsibility and stewardship for the world’s coral reefs. A must-have.
  • Michael, Scott W. and Shimek, Ronald L. Pocket Expert Guides: Marine Fishes and Marine Invertebrates. Microcosm: Vermont, 1999 and 2004. I’m saving up to buy Scott Michael’s more detailed Reef Fishes series, but in the meantime, these two Pocket Expert guides are very useful for drawing up wish lists. Information for the fishes includes: maximum length, range (for those planning geographic-specific reefs), minimum aquarium size, foods and feeding, aquarium suitability and reef aquarium compatibility, and captive care. The invertebrates book includes a category for lighting.

These three books are a great place to start. I have read a few other excellent specialty books on aquarium design, corals, clownfishes, and (sigh) my Hanauma Bay souvenir booklet. Given my past battle with cyanobacteria, a guide to algae is also on my wish list. (Perhaps a little light reading at the community pool during the kids’ swimming lessons?)

At any rate, this post is likely to be the last on the reef tank for quite some time, as construction probably won’t get fully underway for another year or two.

Related posts:

Plumbing, epilogue: Retrench!
Basement, part two: Stairs and framing
Basement, part eight: Halfway complete

Basement, part four: Fiat lux

Sunday, January 28th, 2007 by The Gimlet

East side of family room with wiring, lights, insulation in progressI spent the last month wiring lights and pulling cable for outlets. The first project was to put the can lights in place. I wired them together on a 15 amp circuit using 14/2 WG cable. That circuit also has lights for over the bar and will have lights for the hall (likely the last bit of wiring I will do). We have surrounded the rec room with outlets on two 20 amp circuits (12/2 WG). There is also a specific circuit for the future plasma screen TV (15 amp 14/2 WG ) over the fireplace, and two additional 20 amp circuits for the wall common between the rec room and the laundry room. (Your usual narrator has quite a thing for large fish tanks, and I am just planning ahead for a project set for my future.). (more…)

Related posts:

Plumbing, part two: Bathrooms, etc.
Plumbing, epilogue: Retrench!
Wrapped in plastic

Basement, part three: A little bit of everything

Saturday, December 30th, 2006 by The Gimlet

Since our last posting I finished framing the stairs and the wall in the laundry room. I have two half walls to finish framing in the work room and the laundry room. However, I ran out of lumber and decided to take care of a few other items. With the wall framed in the laundry room, I was able to move the washer and dryer next to each other. Moving the appliances is the easy part. Getting the water, drain and electrical in place is the difficult part. (more…)

Related posts:

The reward for good work is more work
Basement, part eight: Halfway complete
Basement, part 9.5: A quick trim

Basement, part two: Stairs and framing

Friday, December 1st, 2006 by The Gimlet

Lumber and insulation arriveSaturday afternoon the home improvement store delivery truck delivered lumber and insulation for the next phase of our basement remodeling project. One of the delivery men asked if Thing One would like to pull the air horn on the truck. Thing One was very excited to do it. Thing Two does not like loud noises and started to cry.

The staircase in progressThe first task in the plan was to fix the stair case. Monday after work I pulled out the 1×10 boards out of the wood pile and cut them to fit as risers. I glued the risers in place and then used screws to tie the risers to the treads from underneath and above. Screws on either side of the riser finished it up. I continued until I ran out of screws. I thought I would run to the store to buy more, until I looked outside and saw ice on the roads. (more…)

Related posts:

Basement, part four: Fiat lux
Basement, part five-ish: Is that a powdered sugar donut or drywall dust?
Trust him; he's a lawyer

Basement, part one: Demolition!

Tuesday, November 28th, 2006 by The Gimlet

The family room near the end of the demolition phaseThanksgiving weekend meant I could move forward with the basement remodel. On Thursday morning I pulled down all the ceiling tiles and began to pull down the furring strips. This went rather quickly. On Friday morning, after hitting the big box home improvement sales for supplies to be delivered Saturday, I finished pulling down the furring strips and began to pull down the paneling. Saturday involved renting a large truck and filling it with the refuse that had been pulled down. Uncle B came to help, mainly to move the concrete sink into the truck. Uncle B, Thing One and the Gimlet then finished pulling down the paneling and removed the bar that was anchored to the floor in the rec room. Uncle B and I then took the refuse to the dump. We cleared out 60 lbs short of a ton — 1940 lbs. Now it’s time to rest up for the framing.

(Editor’s note: Since this post was written, the Gimlet has nearly finished remodeling the staircase and has begun framing! More details to follow as time permits.)

Related posts:

Plumbing, part three: It's done!
Nothing good happens quickly in a reef tank
Basement, part twelve: Surviving the journey from before to after